On Sunday, March 12, Five's prepared the technical show for the first Superkombat gala this year. The game was an eliminatory gala for the first Grand Prix of the year, programmed in April and to be broadcasted live in the US.
Five’s became the main technical producer of Superkombat galas, thus coordinating the whole technical production of the event. At the first gala for this year, Five’s created a technical design consisting in a stage system having the dimensions of 18 x 4 m at 1,5 m height, and a two steps ramp, with the dimensions of 6 x 4 m and 4 x 2 m on which the competitors were presented; video screens (2 of 5 x 3 m and one of 6 x 3 m) made out of LED modules on which the live broadcasting was projected, and the light show.
Targeted Audience
The general public interested in sport competition took part at this event.
Technical Equipment Used
The technical equipment used by Fives includes:
- Eurotruss FD34, ST50 truss, Nivtec Platform 200x100 cm
- Lights: Martin Mac 700 Profile, Wash, Eurolite LED PAR 64, SGM Q7, Six-Pack, X5, Grand MA 2 Full Size light controller
- Panasonic PT-D7700E, PT-DW6300KJ videoprojectors, Createled AIRLED 7,7 mm p.p, LED Screen 3,9 mm p.p., LED Screen SMD 8 mm p.p. LED modules